The dock is designed for providing submarines transportation by inland waterways of the European part of the Russian Federation. 7 units were ordered and built for the Soviet Navy.
BASIC PERFORMANCE
Capacity, t | 3600 |
Dock floor length, m | 118,0 |
Length overall, m | 135,1 |
Beam overall, m | 14,0 |
Dock floor beam, m | 3,9 |
Dock entrance beam, m | 7,8 |
Keel-blocks height, m | 0,25 |
Maximum water level above keel-blocks, m | 7,6 |